India - Housing Condition Survey: NSS 65th Round, Schedule 1.2, July 2008- June 2009
Reference ID | DDI-IND-MOSPI-NSSO-65Rnd-Sch1dot2-2008-09 |
Year | 2008 - 2009 |
Country | India |
Producer(s) | National Sample Survey Office |
Sponsor(s) | M/o Statistics & Programme Implementation, GOI - MOSPI - |
Collection(s) | |
Metadata | Documentation in PDF |
Created on
Aug 03, 2016
Last modified
Sep 02, 2016
Page views
274197
Drainage arrangement
(B5_q8)
File: Block-5-Housing characteristics-environment-records
File: Block-5-Housing characteristics-environment-records
Overview
Type:
Discrete Format: character Width: 1 | Valid cases: 153449 Invalid: 0 |
Questions and instructions
Drainage arrangement:
Value | Category | Cases | |
---|---|---|---|
1 | Underground | 17174 | 11.2% |
2 | Covered pucca | 9675 | 6.3% |
3 | Open pucca | 33368 | 21.7% |
4 | Open katcha | 25787 | 16.8% |
5 | No drainage | 67445 | 44.0% |
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
A system for carrying off waste water and liquid waste of the house will be considered as drainage system. Information on the drainage system available to the house will be recorded against this item in codes.It may be noted that if no system exists to carry off the waste water of the house, but water flows down by its own gravity, in an unregulated manner, it will be considered as no drainage, and code 5 will be entered. In other cases, depending upon the drainage system available appropriate code will be given.